Bennett Engineering Services is leading design and construction assistance for left-turn lanes on three approaches at the West Lane/Bianchi Road intersection; one left-turn lane on westbound approach at March Lane/Feather River Drive intersection; and one left turn lane on northbound and southbound approaches at Airport Way/Sperry Road/Arch-Airport Road intersection. The project is funded by the Congestion Mitigation and Air Quality (CMAQ) Improvement Program.
The design team includes ESA, Y & C Transportation Consultants, and O’Dell Engineering, who are providing environmental services, electrical and signals engineering, and surveying, respectively.