Outfalls Feature Stacked Pipe System for Dechlorination
The project included the design of dechlorination systems, chemical feed systems, and SCADA telemetry for three recycled water outfalls for the City of Roseville. The project used a unique “stacked pipe” system for maintaining required contact time for dechlorination and compliance testing prior to discharge.
“As the project manager for the cascade dechlorination project, Steve provided innovative solutions for several engineering hydraulic constraints encountered during design. I appreciated the outside of the box thinking.”
Bryan Buchanan, formerly with the City of Roseville