Bennett Engineering Services to Design West Sacramento River Walk Trail Extension Project

River Walk Trail Levee
When the River Walk Trail is completed, a paved trail will follow the top of the levee.

The City of West Sacramento has selected Bennett Engineering Services to provide project management, engineering design, and bidding assistance services for the River Walk Trail Extension project.

The project will extend the River Walk Trail and levee access road approximately 2,100 linear feet along the levee crown from the existing I Street Bridge northward to the Broderick Boat Ramp. A High Water Event Route along D Street, 3rd Street, and 2nd Street will also be included so that the trail maintains connectivity when the trail at the bridge under-crossing is inundated.

The primary purpose of the project is to provide a safe, ADA-accessible bike and pedestrian trail along the river while also providing a levee access road. The completed River Walk Trail will connect the Washington District and adjacent neighborhoods to the new C Street Bridge and Tower Bridge.

April 10, 2017